The long three day weekend helped John and I get our bug ready for the cage install.  Saturday morning we got the steering wheel and the brake & clutch pedals mounted in the car. On Sunday we got the pad areas cleaned up where the square tube seat rails would be welded to the center tunnel and heater channel. John cut the pads and fitted them and I welded all of them in place. In the afternoon we started fabricating the mounts out of 1/8″ steel plate and 1/8″ 2″x2″ angle.
The driver’s seat is a bit further back than stock and also a bit lower. The co-driver’s seat is about 1.5″ behind the driver’s and is reclined a tad more for comfort. All that’s left to do is fabricate a mount for the gas pedal and then bleed the brakes. Hopefully we can trailer the car out to Scott (Izzy’s custom cages) in two weeks.







1 Comment »